Water Drainage on the BGM Trail

Thank you to E.A. Works Constructions Ltd. for the great work done to complete the water drainage on the BGM Trail.

The three bridges that were installed on the BGM Connector to bypass the B Road were under the supervision of Recreation Sites & Trails BC.  Lots of water collected on the trail and made it difficult to drive between the bridges.