Water Drainage on the BGM Trail
The BGM Trail (also known as "The Connector”), which connects Wells & Barkerville and beyond, underwent an upgrade this year.
A new trail was created to bypass the B Road, and three bridges were installed. However, additional work was required to alleviate the water accumulation around the bridges.
The three bridges that were installed were under the supervision of Recreation Sites & Trails BC. Funding was provided to complete this project.
Thank you to E.A. Works Constructions Ltd. for the great work done to complete the water drainage on the BGM Trail.